I-4 from East of SR 44 to West of I-95

  • Location:
    Volusia County, Florida
  • Client:
    FDOT
  • Completed:
    2015
This project includes the complete reconstruction of I-4 between Deland and Daytona. Our subcontracted work includes construction of two ramp bridges over I-4 and US 92, multiple animal crossings, and the removal and replacement of the existing low level bridges over the Tomoka River. Early completion of the Ramp B bridge over US 92 was vital to the project to relieve congestion during Daytona International Speedway events. To add another level of aesthetics, the new Ramp A bridge over I-4 was the first slipformed, stamped barrier wall constructed in Florida.